Zayed University: rooftop solar

The site and the brief

Solar for a federal university campus.

The client wanted to cut daytime grid consumption without interrupting operations. SOLEC surveyed the rooftop areas, checked the structure and the DEWA connection, and designed a system sized to the site's load profile, so almost all of its output is used on site.

The system

1,200 kWp on-grid solar, rooftop.

Modules
Bifacial mono PERC, 550 Wp
Inverters
String inverters, 8 × 125 kW
Mounting
Rooftop
Monitoring
24/7 remote monitoring, SCADA

How SOLEC delivered it

  1. 01 Assessment and planning 6 weeks Feasibility studies · Solar radiation calculations · Grid connectivity evaluation
  2. 02 Engineering and design 8 weeks Structural layout · PV array optimisation · Battery specification
  3. 03 Construction and commissioning 14 weeks Site delivery · System erection · Diagnostics and grid synchronisation
  4. 04 Operations and maintenance Ongoing SCADA monitoring · Local technicians · Predictive optimisation
How we deliver →

Results

  • 1,980MWh

    Clean energy a year

  • 792t

    CO₂ avoided a year

  • 4.5years

    Expected payback