DEWA Approved Solar EPC Contractor under the Shams Dubai initiative. See our credentials

Who we are

Why SOLEC

Six reasons clients choose us, and keep us for the life of the system

01 / 06

In-house engineering

Systems optimised for cost and the shortest possible payback.

  • In-house engineering: Systems optimised for cost and the shortest possible payback.
  • Safety first: Projects delivered safely and to your service standards, under ISO 45001.
  • Always compliant: Up to date with UAE regulations, for safe performance over the system's life.
  • Tier-1 technology: Strong ties with leading module, inverter and component makers; local-content focus.
  • Maximum yield: Planned and reactive O&M plus cleaning, designed to minimise downtime.
  • 24/7 support: Service team on call 365 days a year, backed by production and product warranties.

Approved

DEWA

Approved Solar EPC Contractor under Shams Dubai: approved to design and install grid-connected solar in Dubai.

Credentials

Every approval a commercial solar project in Dubai needs, held by SOLEC directly.

Award: Best Solar Project, C&I, Solar Week UAE 2024

Registered

Dubai Municipality

Registered for solar and electrical works in Dubai.

Registered

Trakhees

Registered for works in the free zones it regulates, including Jafza.

Certified by TUV SW

  • 9001Quality management
  • 14001Environmental management
  • 45001Occupational health and safety

ISO

Timeline

From France in 2010 to 25 MWp across the UAE

2010

Founded in France

By French and Lebanese renewable-energy specialists.

  1. 2010: Founded in France. By French and Lebanese renewable-energy specialists.
  2. 2015: Headquarters move to Dubai. To serve the fast-growing regional market.
  3. 2018: Hatta, 330 villas. A whole mountain community delivered as one project: 4.8 kWp on each home, about 1.6 MWp in all.
  4. 2023: Ritaj, 1,185 kWp. An on-grid system later recognised at Solar Week UAE.
  5. 2024: Best Solar Project, C&I. Solar Week UAE 2024.
  6. 2025: Emicool, 1,168 kWp. Carport, rooftop and facade solar combined on one site.
  7. Today: 25+ MWp across the UAE. As part of MDS SI Group, with a 24/7 service team on call 365 days a year.

Our team

The people behind the panels

Engineers, project managers and technicians, based in Dubai and on site across the UAE.

  • Placeholder portrait

    General Manager

    Name to confirm

    The client relationship, from first call to signed proposal.

  • Placeholder portrait

    Head of Engineering

    Name to confirm

    Every layout, yield model and electrical design.

  • Placeholder portrait

    Projects Director

    Name to confirm

    Site delivery, installation crews and commissioning.

  • Placeholder portrait

    O&M Manager

    Name to confirm

    Monitoring, maintenance and the 24/7 service desk.

Careers Build the UAE's clean-energy infrastructure with us