The site and the brief
Rooftop solar on a distribution and logistics facility.
The client wanted to cut daytime grid consumption without interrupting operations. SOLEC surveyed the rooftop areas, checked the structure and the DEWA connection, and designed a system sized to the site's load profile, so almost all of its output is used on site.
The system
520 kWp on-grid solar, rooftop.
- Modules
- Bifacial mono PERC, 550 Wp
- Inverters
- String inverters, 4 × 100 kW
- Mounting
- Rooftop
- Monitoring
- 24/7 remote monitoring, SCADA
How SOLEC delivered it
- 01 Assessment and planning 6 weeks Feasibility studies · Solar radiation calculations · Grid connectivity evaluation
- 02 Engineering and design 8 weeks Structural layout · PV array optimisation · Battery specification
- 03 Construction and commissioning 14 weeks Site delivery · System erection · Diagnostics and grid synchronisation
- 04 Operations and maintenance Ongoing SCADA monitoring · Local technicians · Predictive optimisation
Results
858MWh
Clean energy a year
343t
CO₂ avoided a year
4.5years
Expected payback