kWp

The site and the brief
A school that generates much of its daytime power on its own roofs.
The client wanted to cut daytime grid consumption without interrupting operations. SOLEC surveyed the rooftop areas, checked the structure and the DEWA connection, and designed a system sized to the site's load profile, so almost all of its output is used on site.
The system
770 kWp on-grid solar, rooftop.
- Modules
- Bifacial mono PERC, 550 Wp
- Inverters
- String inverters, 4 × 100 kW
- Mounting
- Rooftop
- Monitoring
- 24/7 remote monitoring, SCADA
How SOLEC delivered it
- 01 Assessment and planning 6 weeks Feasibility studies · Solar radiation calculations · Grid connectivity evaluation
- 02 Engineering and design 8 weeks Structural layout · PV array optimisation · Battery specification
- 03 Construction and commissioning 14 weeks Site delivery · System erection · Diagnostics and grid synchronisation
- 04 Operations and maintenance Ongoing SCADA monitoring · Local technicians · Predictive optimisation
Results
1,271MWh
Clean energy a year
508t
CO₂ avoided a year
4.5years
Expected payback