kWp

The site and the brief
Rooftop solar on a large logistics unit beside Jebel Ali port.
The client wanted to cut daytime grid consumption without interrupting operations. SOLEC surveyed the rooftop areas, checked the structure and the DEWA connection, and designed a system sized to the site's load profile, so almost all of its output is used on site.
The system
1,570 kWp on-grid solar, rooftop.
- Modules
- Bifacial mono PERC, 550 Wp
- Inverters
- String inverters, 8 × 125 kW
- Mounting
- Rooftop
- Monitoring
- 24/7 remote monitoring, SCADA
How SOLEC delivered it
- 01 Assessment and planning 6 weeks Feasibility studies · Solar radiation calculations · Grid connectivity evaluation
- 02 Engineering and design 8 weeks Structural layout · PV array optimisation · Battery specification
- 03 Construction and commissioning 14 weeks Site delivery · System erection · Diagnostics and grid synchronisation
- 04 Operations and maintenance Ongoing SCADA monitoring · Local technicians · Predictive optimisation
Results
2,591MWh
Clean energy a year
1,036t
CO₂ avoided a year
4.5years
Expected payback