DEWA Approved Solar EPC Contractor under the Shams Dubai initiative. See our credentials

DEWA · Government · Al Qusais, Dubai

kWp

DEWA Al Qusais building: rooftop solar

The site and the brief

A government building generating part of its own power on site.

The client wanted to cut daytime grid consumption without interrupting operations. SOLEC surveyed the rooftop areas, checked the structure and the DEWA connection, and designed a system sized to the site's load profile, so almost all of its output is used on site.

The system

100 kWp on-grid solar, rooftop.

Modules
Bifacial mono PERC, 550 Wp
Inverters
String inverters, 4 × 100 kW
Mounting
Rooftop
Monitoring
24/7 remote monitoring, SCADA

How SOLEC delivered it

  1. 01 Assessment and planning 6 weeks Feasibility studies · Solar radiation calculations · Grid connectivity evaluation
  2. 02 Engineering and design 8 weeks Structural layout · PV array optimisation · Battery specification
  3. 03 Construction and commissioning 14 weeks Site delivery · System erection · Diagnostics and grid synchronisation
  4. 04 Operations and maintenance Ongoing SCADA monitoring · Local technicians · Predictive optimisation
How we deliver →

Results

  • 165MWh

    Clean energy a year

  • 66t

    CO₂ avoided a year

  • 4.5years

    Expected payback